Uniden BCT10 Operations Instructions Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
Adjusting the Squelch
Think of the Squelch Control as a gate.
1. Turn the SQUELCH control fully counterclockwise. This raises
the “Squelch Gate” so high that no signals can get through.
2. Turn the SQUELCH control fully clockwise until you hear a
hiss. This lowers the “Squelch Gate” so that everything gets
through ... noise, weak signals, and strong signals.
Strong Signals
Medium Signals
Weak Signals
Noise
Strong Signals
Medium Signals
Weak Signals
Noise
Operating Instructions
16
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 39 40

Comments to this Manuals

No comments